2019 Michigan Bridge Conference - Day 1

Email Print

When

Tuesday, March 19, 2019 8:00AM - 5:00PM

Where

Marriott Auburn Hills Pontiac

3600 Centerpoint Pkwy
Pontiac, MI
48341

Get Directions »

Event Registration

Ticket Type Ends Price
Public Agency
March 19, 2019 $85.00
Private Company
March 19, 2019 $110.00
  • This event has reached capacity and your registration cannot be fulfilled. 

    Please contact the Center for Technology & Training at ctt@mtu.edu if you would like to be added to a waiting list. 

    In your e-mail please indicate the event name and include the following for each participant:
    full name - agency name - job title - e-mail address

Event Details

2019 Michigan Bridge Conference - Day 1
Click the image below to view the event flyer

Click for Image

Cancellation Policy: No-shows and cancellations within three business days prior to the workshop or conference will be charged the full registration fee. Substitutions will be accepted.


Michigan Tech reserves the right to use any pictures taken during this event for advertising and/or instructional purposes

 

PRESENTATIONS - Day 1: Educational Sessions

1. Introduction - video 1 and video 2
Chris Gibertson—Center for Technology & Training

2. National Bridge Inspection (NBI) Program Overview
Sonny Jadun, PE – FHWA;   Ralph Pauly, PE – FHWA

3. NBI Program Metric 12
Sonny Jadun, PE—FHWA Resource Center
Allie Nadjarian, PE—MDOT

4. NBI Program Metric 13 & 14 - part 1 and part 2
Thomas Saad, PE—FHWA Resource Center
Creightyn McMunn, PE—MDOT

5. NBI Program Metric 15- part 1 and part 2
Sonny Jadun, PE—FHWA Resource Center
Brian Zakrezewski, PE—MDOT

6. NBI Program Metric 18
Erik Carlson, PE—MDOT Hydraulic Unit
Allie Nadjarian, PE—MDOT

7. Inspection Technology: 3D Bridge App
Reid Sawtell—Michigan Tech Research Institute

8. Quality Assurance/Quality Control Program
Allie Nadjarian, PE—MDOT
Eric Rickert, PE—Great Lake Engineering Group
Rich Kathrens, PE—Spicer Group, Inc.
Amy Trahey, PE—Great Lakes Engineering Group, LLC

9. Quality Assurance/Quality Control Case Study
Amy Trahey, PE—Great Lakes Engineering Group, LLC

 

PRESENTATIONS - Day 2

1. FHWA Update
Ralph Pauly, PE—FHWA

2. MDOT Update
Matt Chynoweth, PE – MDOT

3. Local Bridge Program Update
Keith Cooper, PE—MDOT

4. Question & Answer

5. Bridge Construction/Railroad Coordination
Ryan Hoensheid, PE—MDOT Office of Rail

6. Channel Design at Road-Stream Crossings
Holly Vickers—MDEQ Transportation Review Unit
James Watling, PE—MDEQ Water Resources Division

7. Bridge Bundling
Beckie Curtis, PE—MDOT

8. Bridge Asset Management
Beckie Curtis, PE—MDOT

9. Routine Bridge Inspection Using a Drone
Jason Fogg, PE—HDR, Inc.
Mile Wilson, PE—MDOT

10. Technical Aspects of GRS/IBS Bridge Design & Construction
Craig Schripsema, PE—OHM Advisors

11. Substructure Repair
Michael Close, PE—GeoStabilization International

12. 2018 Anchor Link Replacement on Original Blue Water Bridge
Craig Dashner, PE—OHM Advisors
Tom Bachmayer—OHM Advisors

Hosted By

Center for Technology & Training